Global inquiries · High-performance polymers

PEI grades — page 8 of 8

Models 351–366 of 366. TERM is EXW; stock on hand is the tonnage we hold in Dongguan.

366models listed
5producers
8pages in this list
EXWterm on every line
MaterialBrand, model and colourProducerTermStock on hand
PEIVH1003-1000SabicEXW1.85 t
PEIXH1015-1000SabicEXW0.20 t
PEIXH2315-1000SabicEXW0.50 t
PEIHTX1010FSABICEXW0.25 t
PEI3500SyensqoEXW2.30 t
PEIPEI-VAT002Wanrun (Yantai)EXW2.10 t
PEIPEI-VAT002BKWanrun (Yantai)EXW3.40 t
PEIPEI-VAT002HFWanrun (Yantai)EXW0.30 t
PEIPEI-VAT002P100Wanrun (Yantai)EXW3.45 t
PEIPEI-VAT002P200Wanrun (Yantai)EXW1.35 t
PEIPEI-VAT002P350Wanrun (Yantai)EXW0.40 t
PEIPEI-VAT002P50Wanrun (Yantai)EXW1.30 t
PEIVAT002G10Wanrun (Yantai)EXW1.15 t
PEIVAT002G20Wanrun (Yantai)EXW0.20 t
PEIVAT002G30Wanrun (Yantai)EXW0.80 t
PEIVAT002HFBKWanrun (Yantai)EXW0.25 t

Page 8 of 8 · models 351–366 of 366

TERM is EXW for every line; stock on hand is the tonnage held in Dongguan. Reference prices for the same grades are on the price index.

Need a grade, colour or volume that is not on this list? Send the model and tonnage and the sourcing team will confirm availability, the delivery term and the price.